Bathroom renovations, planned plumbing installations and commercial fit-out work across Merseyside.
Discuss your projectPlumbing, with bathrooms at its centre.
Bathrooms sit at the centre of SMC’s plumbing work, alongside planned installations and commercial fit-outs.
Bathroom renovations
Full bathroom installation and refurbishment, with attention to layout, finish and the completed space.
Plumbing installations
Plumbing installation work where the scope can be properly understood and planned before work begins.
Commercial fit-outs
Washrooms, toilet facilities and plumbing work associated with commercial and shop fit-outs.
A bathroom is planned as a whole, with the layout, fittings and finish considered together from the start.
- 01Full renovationStrip-out through to the finished room, carried out as one piece of work.
- 02Coordinated finishLayout, fittings and finish planned together from the start.
- 03Visible detailFittings, edges and alignments considered as part of the finish.
- 04Behind the finishThe pipework and connections you won't see, installed to the same standard.
Washrooms, fit-outs and planned installations.
SMC also carries out planned plumbing for commercial washrooms, shop fit-outs and other installation work.
Plumbing installations
Planned plumbing work beyond a full bathroom, where the scope can be understood and the installation properly considered in advance.
Commercial fit-outs
Washrooms, toilet facilities and plumbing work associated with commercial and shop fit-outs.
From first fix to the completed washroom.
Thought through before it's finished.
Good plumbing starts with understanding the job. These are the things worked through on every installation.
- 01Understand the workWhat's there now and what you want are looked at before anything is quoted.
- 02Access and existing conditionsExisting pipework, access and the building itself are considered from the start.
- 03Plan the installationThe order of work is set out so each stage follows on properly.
- 04Suitable productsProducts chosen to suit the installation and work with what's already in place.
- 05Test completed workCompleted work is tested before handover.
- 06Clear communicationIf something changes, you'll hear about it as the work progresses.
Planning a bathroom, fit-out or plumbing project?
Tell us what the work involves and where you're based. We'll get back to you to talk it through.









